First 6 of 6 paragraphs shown Deadline: 30/03/2010 - The Specification has three (3) Separable Portions: - Separable Portion 1 of the Contract Specification work involves the remediation works of the existing 96C 132kV transmission line, between TransGrid's Armidale 330/132kV Substation and its Coffs Harbour 330/132 kV Substation, to ensure the ground clearance is acceptable for operation of the conductor at a temperature of 100C. - Separable Portion 2 of the Contract Specification work involves the uprating of an existing 330kV twin timber pole transmission line, between TransGrid's Tamworth 330kV Substation and its Armidale 330 kV Substation, to ensure the ground clearance is acceptable for operation of the conductor at a temperature of 100C. - Separable Portion 3 of the Contract Specification covers the dismantling works of the remaining section of the 96K Armidale to Coffs Harbour 132kV transmission line, situated near to the Coffs Harbour Substation ...Log in to read rest of Article or image. |